H21 HOT WORK TOOL STEEL

TEMPERING

Tempering should be carried out immediately after proper completion of the quenching operation.  Heat to within the 560°C / 675°C range soaking for two to three hours according to section.  A second tempering cycle of similar duration is strongly recommended and care should be taken to ensure that the tools are allowed to cool to room temperature at least 50°C higher than that which the tools may be expected to achieve in service.  The curve given indicates typical hardness values obtained on oil quenching from 1160°C and double tempering.